Western Digital at Hitachi Campus in Cottle Transit Village

For the past 15 years Ruth and Going has been the Project Civil Engineer on the Consultant Team for numerous projects in the redevelopment of this former 323-acre IBM industrial campus into a mixed-use development of industrial, residential and commercial uses off Great Oaks Boulevard in South San Jose. Most recently, Ruth and Going was responsible for design of the site improvements for the first phase of Western Digital’s plan to update and rebuild the Great Oaks Campus. This project constructed a new 130,000 square foot 4-story Administration Building, a 100,000 square foot 2-story Engineering Building and associated campus improvements on a 9.5-acre portion of the Campus.

2

Skybox at Memorex Drive

This project consisted of obtaining land use (Project Clearance Committee) approvals and construction documents for demolition of existing buildings and site improvements for construction of a new 475,000 square foot 4-story data center and office building. Construction documents for improvements within the fronting public streets, including new sidewalk, water, storm and sewer laterals, water main replacement, and SVP joint trench. The project also includes an electrical substation on the site. The project has received entitlement approval, construction documents are nearly ready for submittal to the City, with construction scheduled for second quarter 2021. HMH will provide construction staking to the contractor.

3

RiCloud at Via Del Oro

This project consisted of construction documents for site improvements on an existing site for the conversion of an existing 74,000 square foot industrial building into a data center. Site improvements included site security, modifications for installation of generators and equipment yards, and post-construction stormwater treatment control measures. Construction is nearly complete.

4

China Mobile International

HMH’s involvement included the acquirement of a special use permit and construction documents for demolition of an existing 160,000 square foot building and site improvements of an industrial site for a 5-story office and twin 4-story data center buildings totaling approximately 312,000 square feet. Construction documents for improvements within the fronting public streets, including new sidewalk, and utility laterals. The project is currently under construction, with completion scheduled for 2022. Currently providing construction surveying services to the contractor.

5

Equinix SV10/11 Colocation, Great Oaks Boulevard

This project included obtaining a Planned Development Permit and construction documents for development of a vacant site to accommodate two 2-story buildings of 191,000 square feet in Phase 1 (SV10) and 155,000 square feet in Phase 2 (SV11). The SV10 portion of the site was completed in September 2017. Construction of the SV11 building and site improvements is in process with completion of construction anticipated in Summer 2021. The project accommodates approximately 3,000 data cabinets in six data halls. The data halls are conditioned by forty-two indirect evaporative cooling units. Seven generators are located external to the electrical rooms and provide twenty-one megawatts of back-up power. The SV11 project included coordination with PG&E for the undergrounding of existing overhead electrical lines and relocation of the on site main electrical feed to the SV5 data center.

6

Equinix Great Oaks South/SV12

HMH’s involvement included the acquirement of a Special Use Permit and construction documents for development of a greenfield site to accommodate a campus of three 2-story buildings totaling approximately 465,000 square feet. Preparation of plans for the first building on the campus, the 153,000 square foot SV12 building and improvements within the fronting public streets was nearly complete when the owner revised the project to increase the number of generators. This triggered the requirement for a Small Power Plant Exception approval from the California Energy Commission (CEC), which is currently in process along with an amendment to the City’s previously approved Special Use Permit.

7

Microsoft Data Center, SJC04

This Microsoft Data Center project involves a new data center campus on approximately 21.25 acres of greenfield site. It will also consist of a one 5-story data center building and the entire associated sitework.
HMH’s involvement includes design of the sitework only, consisting of grading, drainage, stormwater treatment, site “wet” utilities (storm, sanitary, domestic water, fire water and recycled water), site roadways and parking, and landscape. We will also provide design of the grading, paving and storm drainage for a new electrical substation. Furthermore, we’re responsible for coordinating the layout of all site utilities; however, design of “dry” utilities (telecommunications, fiber, gas, electric, gas, etc.), and the substation facilities is not part of the scope of work.