New Search

If you are not happy with the results below please do another search

305 search results for:

221

Shoreline Athletic Fields

HMH collaborated with Tetra Tech BAS to provided landscape architecture and civil engineering services for the new community Sports Park/Athletic Field which includes batting cages, children’s playground, and ancillary Parking Lots on the former Shoreline Landfill site (12.6 acres). The project design included planting basins with impermeable liners, drip irrigation and subdrains to prevent nuisance water from penetrating the cap while still allowing for planting over the cap.
The biotreatment cells were designed as a naturalistic feature of the site and included decorative boulders, drought tolerant grasses, and river rock. These elements created a visually aesthetic and green functioning solution to stormwater runoff. A 0.75 acre burrowing owl habitat was protected and restored on the south side of the project. This area was hydroseeded with a specialty seed mix that bolsters the owls’ habitat. This site was further developed by the City’s wildlife specialist to continue to protect the owl species.

222

Britton Middle School

The Morgan Hill Unified School District (MHUSD) updated the Britton Middle School campus on West Central Avenue. This 25-acre project consisted of the demolition and clearing of a portion of the site, rough grading, site utility coordination, construction of three new Folia Classroom buildings and the construction of a new 2-story Student Union building. Additional dedicated spaces include an administration office, library, kitchen, multi-use room, science labs, a makerspace, restrooms, collaborative break-out areas and storage rooms. One of the many goals of the project is to provide a welcoming entrance into the historic downtown Morgan Hill area.

223

Harker School

The Harker School’s brand new athletic center is a 33,000 sq-ft facility which features a 12,000 sq-ft gym, athletic training room with advanced hydrotherapy unit and spacious team rooms. The additional expansion of the Rothschild Performing Arts Center features a 450 seat theater with fly loft and hydraulic orchestra pit, state of the art scene shop, and musical/theater classrooms. The landscape design incorporates a few sustainable practices, such as enhancing water quality, conserving water, and reducing heat island effect.

 
 
 
 

*Photos provided by The Harker School

224

Hamilton Plaza

Hamilton Plaza is an innovative Class A multi-tenant office development in Campbell, ideally located adjacent to the Hamilton VTA light rail stop and biking distance to downtown Campbell and the Pruneyard shopping center. HMH partnered with SteelWave in order to better connect the two existing office buildings and provide an effective collaboration space. HMH conceptualized and implemented improvements to the large outdoor plaza over the existing parking structure. A fitness patio, fountain, gaming area and modernized material palette along with a variety of seating arrangements and types are introduced in order to foster various group activities and alter the climate for an improved user experience.

225

1421 McCarthy

Located in Milpitas, 1421 McCarthy is a market ready office building covering 31,165 SF. HMH partnered with Studio G Architects in transforming this building into a more unique usable space. Some of the key design features include a monumental stair entrance with concrete board form wall, a branded concrete patio with seating and a cantilever wood bar counter.
1421 McCarthy is also conveniently located near the Tasman VTA light rail stop and is two stops from the Milpitas BART Station.

226

Santa Clara University

HMH has a strong relationship with Santa Clara University from helping them transform their campus to having fellow Broncos as part of the HMH team. As the school continues to build upon their student experiences on campus, we are there to provide the services we can. The campus improvements provide state-of the art facilities, community gathering spaces for students and faculty, and dedicated dining and outdoor areas.
HMH assisted Devcon’s architects on many projects providing civil engineering design of site grading, drainage and utilities. HMH also performed land surveying services to obtain topographic information and provide construction staking for the project.
 
Santa Clara University Projects:

Leavey School of Business
Buck Shaw Stadium Renovation
Locatelli Student Center
Stanton Soccer Fields
Larder House (Historic Home Renovation)
Santa Clara University Athletic Excellence Center
Sullivan Aquatic Center
Soccer Athletic Facilities and Locker Room
Alviso Street Parking Garage
Collegiate Volleyball Court

228

Betsy Ross

HMH partnered with Korth Sunseri Hagey Architects to create Betsy Ross, a market-ready project which is located next to major freeways (87, 101, 880, and 237) and is also walking distance from the VTA light rail. Some of the key landscape features include a lighted feature wall, synthetic lawn gaming area, an outdoor lounging balcony space and dining patio. Experience this project in video below.

230

Concourse San Jose

The HMH Landscape Architecture team redeveloped an existing courtyard between two high-rise buildings. The existing large water feature and art piece was replaced to create a new outdoor space that aims to enhance interaction with the outdoor environment.
The design incorporates a large pavilion structure, bar-height counters, a porcelain wood effect tile decking, synthetic turf flex space, and a large grand staircase entry. The entire courtyard is being lifted about 18” to create better visibility of the site from the adjacent road.